G-Max Installation Webinar

A Smart Rack for Smart Installers: A Focus on the 5 Steps to G-Max Installation and Site Workflow

April 4, 2018 at 2 pm ET (1 pm CT, Noon MT, 11 PT)

Register Now

Summary

As the premier manufacturer of high-grade steel solar mounting systems, Schletter offers the next generation of racking with G-Max. G-Max’s fixed-tilt construction is ideally suited for utility-scale installations, and exceptional ease-of-assembly in the field and competitive pricing distinguish this American-made steel mounting system from their competitors.

In fact, widely recognized for its thoughtful, streamlined design and components that are known for their strength and safety, the G-Max system’s fast and easy installation is so simple that a single person can install the girder, head adapter, and strut without assistance. Its components are optimized for strength and safety, and offer 25% more girder strength and a 40% increase in purlin spans. With more adjustment capability in the field, reduction of hardware, and lower costs across multiple installation steps, G-Max is saving customers both time and money.

On April 4 at 2 pm ET, Schletter will be offering an educational webinar on A Smart Rack for Smart Installers: Focusing on the 5 Steps to G-Max Installation and Site Workflow.

Join us for this one-hour session to learn the following:

  • See installation videos on the 5 steps including ramming posts, girder assembly, purlin layout, purlin alignment, and installing modules. You will get pro tips from our presenters and subject matter experts.

  • Hear about site workflows including how many team members are required to complete the project safely and efficiently while saving on installation costs.

  • Hear about recommended equipment such as the GAYK Hydraulic ram or lull or the specific tools needed to streamline the installation process.

Bonus: Join us for the webinar and we will send you a COMPLIMENTARY Installation and Site Workflow Guide perfect for ground mount installations. This is a great resource for site workflows, team members, equipment and tools and the safety checks. Don’t miss this excellent educational session on April 4 at 2 pm to see why G-Max is the innovative and smart way to install utility scale racking.

Register Now

Speakers

Ryan Kelly

Ryan Kelly

VP of Sales and Marketing
ryan.kelly@schletter-group.com

In 2008, Ryan Kelly began working for Schletter as one of the initial employees of the US operations. Over the last 9 years, he has been Engineering Manager, General Manager of Schletter Canada, and now assumes the position of Vice President of Sales Operations in North America. more ..

Eddie Bugg PE, LEED AP

Eddie Bugg

Executive Vice President, Technologies & Applications
eddie.bugg@schletter-group.com

Eddie Bugg serves the Schletter North America group, providing engineering and construction leadership in key technical functions, including, including Research & Development, Product Development, and Field Operations. more ..

What our customers are saying about G-Max.

“O2 EMC chose the G-Max product because both pricing and ease of installation were driving forces on this project” Kelly Hendley, O2 EMC
“Ultimately, the G-Max project was a success because our end customer is happy with the installation and we were able to install it in less than ¼ of the time it would have taken compared to other racking systems,” Kenneth Pfannenstiel, Big Dog Energy

SCHLETTER NA INC

1001 Commerce Center Drive
Shelby, NC 28150
Call: (888) 608 - 0234
Fax: (704) 595 - 4210
info.us@schletter-group.com

SCHLETTER CANADA INC

3155 Howard Ave, Unit 202
Windsor, ON N8X 4Y8
Call: (519) 946 - 3800
Fax: (519) 946 - 3805
mail.canada@schletter-group.com

Schletter GmbH (DE)

© 2017 Schletter. All Rights Reserved.